Sponsored results

34193, 15796, 33456, 17208, 21154

All "House Demolition" results near me in Booneville, AR - April 2026

H&A Waste

Booneville, AR
  • Concrete Removal
  • Light Demolition
  • Structures and Interiors
  • Local business
  • Professional and reliable

As a locally owned company, we take pride in doing the job right, showing up on time, and leaving your property clean and secure. Ready... more

H&A Waste logo

Raggio Excavating

Booneville, AR

Located in Booneville, AR, Raggio Excavating is a family owned demolition company specializing in both large and small projects. We can provide comprehensive services, ranging... more

RE

Wohali LLC

Fort Smith, AR

We are a Native American owned construction and demolition company providing a multitude of services for a wide range of clients. To learn more about... more

WL

Mullen Construction

Mena, AR

Mullen Construction is a general contractor based out of Mena, Arizona specializing in construction, excavation, and demolition services. We have the manpower and equipment to... more

MC

A & W Construction Co

Fort Smith, AR

Based in Fort Smith, AR, A & W Construction Co is a leader in commercial and residential demolition services. From house demolition to interior demolition, pool... more

AW

House and Garage Demolition Tips for Booneville, AR

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.