32375, 17615, 36494, 20968, 18873, 22143

3-D Contractors Inc

Moss Point, MS

3-D Contractors Inc is a locally-owned company with 25 years of experience in the commercial and residential demolition industry. We take pride in leaving each job... more

3-D Contractors Inc logo

CDI Renovation

Chickasaw, AL

Founded more than 30 years ago, Dortch Figures & Sons specializes in demolition and lot clearing services, including house demolition. We also perform home renovations and building... more

CR

Halls Land Solutions LLC

Saraland, AL

Looking to tear down an old or unwanted home safely and quickly? Our team ensures the entire structural demo process is smooth from start to... more

HL

L & J Dirt Inc

Mobile County, AL
5.0
(1)

Serving Mobile County, Alabama, L & J Dirt Inc offers a wide range of services. We specialize in excavating and demolition services, tearing down everything from... more

LJ

S&S Hauling LLC

Mobile, AL
1.0
(1)

Founded in 2015, S&S Hauling LLC has fast become a leading provider of demolition, full-service junk removal, and debris hauling services out of Mobile, AL.... more

SH

The Dumpster Guy

Fairhope, AL

When you need fast and efficient garage demolition, The Dumpster Guy is here to help. Whether you need a garage torn down, shed removed, or... more

TD

House and Garage Demolition Tips for McIntosh, AL

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.