30467, 32418, 17208, 23934, 23877

Greennecks

Jessieville, AR
5.0
(1)
  • Commercial
  • Residential
  • Transparent pricing
  • Safe and accurate
  • Experienced professionals

For house and garage demolition services anywhere in Arkansas, Greennecks provides top-tier equipment and expertise for projects of all sizes. Get in touch today for... more

Greennecks logo

Junk King Dumpster Rentals

Bauxite, AR

Junk King Dumpster Rentals provides garage demolition services throughout Little Rock, AR and the surrounding communities. We provide optimal service and competitive prices while utilizing... more

JK

Mullen Construction

Mena, AR

Mullen Construction is a general contractor based out of Mena, Arizona specializing in construction, excavation, and demolition services. We have the manpower and equipment to... more

MC

Slaight Ervan House Moving

Hot Springs National Park, AR

Slaight Ervan House Moving is a premier demolition contractor for the Hot Springs National Park community. We have the necessary equipment and experience to provide... more

SE

Mchenry Excavating

Hot Springs National Park, AR

McHenry Excavating, Inc. is a family owned and operated company that started in 1996. For the past 20 years, we have been providing commercial and residential site... more

ME

House and Garage Demolition Tips for Jessieville, AR

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.