18880, 16337, 24023, 16779, 32183

Bandy Concrete & Excavating

Springfield, IL
  • Commercial
  • Concrete
  • Interior
  • Pool
  • Residential
  • Free estimates
  • Friendly service

Founded in 1997, Bandy Concrete & Excavating is here to serve you in every capacity, providing excellent workmanship and high-quality results that you deserve. In... more

Bandy Concrete & Excavating logo

West Dozer Service

Jacksonville, IL

West Dozer Service is locally owned and operated and specializes in residential and commercial demolition and excavating services, as well as site prep and clearing,... more

WD

Jaren Industries Inc

Springfield, IL

Jaren Industries Inc is a demolition and excavation company serving all of Central Illinois. Our projects include residential and commercial demolition, interior demolition, grading,... more

JI

Rouland Construction & Trucking

Jacksonville, IL

Rouland Construction & Trucking offers customers throughout the Jacksonville, Illinois area high-quality house demolition services. We are dedicated to serving our customers, no matter how big... more

RC

LJs Crew LLC

Ashland, IL

LJs Crew LLC specializes in a variety of services to meet our customers' range of needs. Whether you need waste removal, landscaping, or light demolition,... more

LC

House and Garage Demolition Tips for Virginia, IL

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.