17557, 17636, 19820, 15043, 22622

Baker Enterprises, Inc.

Clermont, IA

As a full-service excavation company, Baker Enterprises, Inc. has performed numerous demolition projects. We’ve removed a variety of structures, including agricultural, commercial, industrial,... more

BE

Blake Excavating

Waukon, IA

Based in Waukon, Iowa and serving surrounding areas, our team at Blake Excavating knows what it takes to complete your demolition project on time and... more

BE

JT Trucking and Excavating

Decorah, IA

JT Trucking and Excavating is a premier contractor based in Decorah, Iowa, committed to exceptional results. With our manpower, equipment, and combined experience, we can... more

JT

Keppler Custom Hire LLC

Saint Olaf, IA

Keppler Custom Hire LLC is an excavation and demolition expert servicing the Elkader, IA area. We have a large fleet of cutting-edge equipment needed to... more

KC

Rasmussen Drainage Service LTD

Independence, IA

Rasmussen Drainage Service has been recognized as a leader in the site preparation field and has been for more than 44 years. With a highly-trained team... more

RD

Pool Removal Tips for Castalia, IA

A pool fill-in—or partial pool removal—does not involve removing the entire pool, thus saving you time and money. Many homeowners choose this option as it is cheaper, faster, and does not take as long as a full removal. Pool fill-ins work as follows:

  • Drain the pool.
  • Punch holes into the bottom of the pool.
  • Demolish the top layer of the pool (18 in.-36 in.).
  • Place the rubble in the bottom of the pool.
  • Fill in the pool with additional dirt and topsoil.
  • Compact the soil.

Unless your city requires, a partial pool removal can be done without the oversight of an engineering technician. Be sure to confirm this with your contractor and/or local code enforcement entity.