16692, 22641, 15081, 16958, 17364, 18581

Gregory's Disposal

Fairfield, ME
3.7
(3)

Tearing down a house? We make house demolition easy, from the initial teardown to full debris cleanup. Our team of professionals is highly accurate, completing... more

GD

Len Poulin Inc

Waterville, ME

Len Poulin Inc goes above and beyond for each and every client we serve. We know what it takes to complete house demolition projects on... more

LP

Gerald Mackenzie

Waterville, ME

Gerald MacKenzie General Contractor, Inc. has been in operation for more than 25 years. We have provided, and continue to provide, excavation and paving services for... more

GM

Rossignol's Excavating Inc

Oakland, ME

Rossignol's Excavating was founded in 1974 and has been serving the Central Maine region for more than 45 years. We are a small company specializing in residential... more

RE

Phaze One Excavations

North Monmouth, ME

Phaze One Excavations provides the North Monmouth, Maine with impeccable services and competitive prices. Our staff is committed to providing total customer satisfaction with each... more

PO

Edwards Concrete and Excavation

Effingham, NH
4.6
(7)

Edwards Concrete and Excavation serves residential and commercial customers in New Hampshire and the Portland, ME area.  For over a decade, the team at... more

EC

House and Garage Demolition Tips for Waterville, ME

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.