33483, 33482, 33481, 33480, 22899, 22641, 15081

Whitmore Contracting Inc

Eddington, ME

At Whitmore Contracting, we offer residential and commercial services throughout Central and Downeast Maine. We are family owned and operated and take pride in our... more

WC

N.S. Giles Foundations Inc

Bangor, ME

Let the experts at N.S. Giles Foundations, Inc. get your project off to a strong start with quality pool removal. Since 1998, we've provided quality... more

NG

Want It Gone! Junk Removal & Demolition

Hampden, ME

Want It Gone! Junk Removal & Demolition has provided services to the Greater Bangor area for the past 30 years. We are ready to get the job... more

WI

C.A. Strout & Sons

Bangor, ME

C.A. Strout & Sons is a Maine excavation contractor offering site work preparation and demolition to the Greater Bangor area, including pool removal. Three generations... more

CS

Hughes Bros. Inc.

Hampden, ME

Hughes Bros. Inc. has been a pillar in the Bangor, ME community for over 90 years and is a trusted resource for a wide range of... more

HB

Len Poulin Inc

Waterville, ME

Len Poulin Inc goes above and beyond for each and every client we serve. We know what it takes to complete pool removal projects on... more

LP

Gerald Mackenzie

Waterville, ME

Gerald MacKenzie General Contractor, Inc. has been in operation for more than 25 years. We have provided, and continue to provide, excavation and paving services for... more

GM

Pool Removal Tips for Plymouth, ME

A pool fill-in—or partial pool removal—does not involve removing the entire pool, thus saving you time and money. Many homeowners choose this option as it is cheaper, faster, and does not take as long as a full removal. Pool fill-ins work as follows:

  • Drain the pool.
  • Punch holes into the bottom of the pool.
  • Demolish the top layer of the pool (18 in.-36 in.).
  • Place the rubble in the bottom of the pool.
  • Fill in the pool with additional dirt and topsoil.
  • Compact the soil.

Unless your city requires, a partial pool removal can be done without the oversight of an engineering technician. Be sure to confirm this with your contractor and/or local code enforcement entity.