Sponsored results

16108, 18516, 32126, 18014, 31982

All "House Demolition" results near me in Walthall County, MS - June 2026

Over The Horizon, LLC

Covington, LA
5.0
(1)
  • Commercial
  • Interior
  • Residential
  • Structural
  • Since 2007
  • Veteran owned
  • Customer oriented

We’re capable of demolishing homes of any size or condition. Over the Horizon LLC is a veteran-owned company with decades of combined experience performing... more

Over The Horizon, LLC logo

Doyle Miller Excavating Inc

Foxworth, MS

Doyle Miller Excavating Inc offers a variety of excavating, site preparation, and demolition services to residential and commercial customers. Our team is adept at clearing... more

DM

Dirty Works Dumpsters

Poplarville, MS

If you are looking for a reliable demolition company to tear down a garage or house on your property in the South Mississippi area, Dirty... more

DW

D O Fussell Contracting Inc

Franklinton, LA

D O Fussell Contracting Inc is the A-team of the demolition industry in the Bogalusa, LA area. We offer a wide range of services, including... more

DF

Bergeron's Pro

Covington, LA

At Bergeron's Pro, our team has the experience and high-quality equipment needed to handle all your structural and interior demolition needs, including garage and house... more

BP

House and Garage Demolition Tips for Walthall County, MS

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.