32470, 32126, 23111

A&J Demo & Construction

Collins, MS

A&J Demo & Construction is proud to provide a wide range of services to residential and commercial customers throughout the area. Reach out to us... more

AD

Dirty Works Dumpsters

Poplarville, MS

If you are looking for a reliable demolition company to tear down a pool on your property in the South Mississippi area, Dirty Works is... more

DW

BJ’s Service Group, Inc

Picayune, MS
5.0
(1)
  • Concrete & Asphalt
  • Houses
  • Outbuildings
  • Pools
  • Quality work
  • Free estimates
  • Serving Louisiana
  • Since 2016

Serving all off St. Tammany and Slidell, LA areas, BJ’s Waste, Inc. is the local north shore leader in roll-off containers, light demolition, and... more

BJ’s Service Group, Inc logo

Pool Removal Tips for Lumberton, MS

A pool fill-in—or partial pool removal—does not involve removing the entire pool, thus saving you time and money. Many homeowners choose this option as it is cheaper, faster, and does not take as long as a full removal. Pool fill-ins work as follows:

  • Drain the pool.
  • Punch holes into the bottom of the pool.
  • Demolish the top layer of the pool (18 in.-36 in.).
  • Place the rubble in the bottom of the pool.
  • Fill in the pool with additional dirt and topsoil.
  • Compact the soil.

Unless your city requires, a partial pool removal can be done without the oversight of an engineering technician. Be sure to confirm this with your contractor and/or local code enforcement entity.