21332, 21310, 33544, 18899, 17599

Coulter Excavating

Smithville, MO

Coulter Excavating offers a wide range of services to Smithville, MO and surrounding areas. They provide high-quality excavation, grading, hauling, rock, trenching, and snow removal... more

CE

Houston Excavating & Demolition

Northmoor, MO
5.0
(9)
  • Concrete
  • Interiors
  • Small Structures
  • Family owned
  • Great prices

Houston Excavating & Demolition is equipped to safely and efficiently complete any size home demolition project. We are a family-owned business founded in 1992. We’re a... more

Houston Excavating & Demolition logo

Ideker, Inc.

Saint Joseph, MO

Ideker, Inc. is a family owned construction company specializing in house demolition services of all sizes. We have the equipment and expertise to complete any... more

II

O'Connor Excavation

Raytown, MO
5.0
(3)

Founded in 2014, O'Connor Excavation is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty,... more

OE

Specialized Demolition Inc

Hamilton, MI

Licensed and insured, Specialized Demolition, Inc. has been serving Hamilton and the greater Allegan, MI area since 2001. They specialize in all things demolition and excavating,... more

SD

House and Garage Demolition Tips for Weatherby, MO

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.