19261, 23781, 17598, 33408, 33560, 33315, 21075, 32550, 28317, 19583, 17102, 17455, 24269

JMEC Construction, LLC

Georgetown, SC
5.0
(3)
  • Commercial
  • Residential
  • Safety driven
  • Over 20 years of experience
  • Licensed and insured

As a full-service general contractor, JMEC Construction is proud to offer construction, demolition, and hauling services. We are able to get your house demolition project... more

JMEC Construction, LLC logo

Robert Palmer & Sons

Wilmington, NC
5.0
(3)
  • Barns
  • Houses
  • Interior Demolition
  • Friendly service
  • Professional and reliable

Robert Palmer & Sons is proud to serve Wilmington, North Carolina and surrounding areas, offering residential demolition that can't be beat. Our team is qualified to... more

Robert Palmer & Sons logo

Bluewater Excavating

Ash, NC
4.9
(10)
  • Concrete & Asphalt
  • Interior
  • Pools
  • Structural
  • Free estimates
  • Friendly service

We are a full-service demolition and excavation contractor. We have a large fleet of vehicles and heavy equipment to undertake house demolition, building demo and... more

Bluewater Excavating logo

Veterans Easy Trash Service Wilmington NC

Ash, NC
5.0
(1)
  • Above-Ground Pools
  • Interior Demolition
  • Small Structures
  • Veteran owned and operated
  • Hardworking and honest
  • Transparent pricing

Finding quality garage demolition services isn't always easy in North Carolina, but the team at Veterans Easy Trash Service can help! All jobs are completed... more

VE

4 Seasons Demolition

Wilmington, NC

Starting as a small local contractor, 4 Seasons has expanded to operations across North and South Carolina and has become known as an extremely qualified and... more

4S

Silas Ridge Construction Services, Inc. - Wilmington NC

Carolina Beach, NC

With over thirty years in the industry, Silas Ridge Construction Services, Inc. is ready to meet your demolition needs! We provide full demo services and... more

SR

Miller's Install and Handy Services

Nichols, SC

Miller's Install and Handy Services is proud to serve Nichols, South Carolina, and surrounding communities. We specialize in a variety of handy services, including junk... more

MI

Junk King Myrtle Beach

Conway, SC

At Junk King Myrtle Beach, we are passionate about removing clutter safely and economically. We can handle interior demolition, concrete removal, garage demo, fence removal,... more

JK

Dirty Dog Dumpsters

Little River, SC
5.0
(1)

Dirty Dog Dumpsters is a family-owned and run small business that offers light demolition, junk removal, and dumpster rentals throughout the greater Myrtle Beach, SC... more

DD

Intense Maintenance

Whiteville, NC

Intense Maintenance serves Whiteville, NC and surrounding areas, offering extensive demolition and junk removal services to meet the needs of residential and commercial customers. We... more

IM

Allen's Scrap Metal LLC

Loris, SC

Allen's Scrap Metal LLC was founded in the 1980s and remains a family-owned and operated company to this day. We are experts in concrete removal,... more

AS

Thompson Landscape & Construction

Whiteville, NC

Thompson Landscape & Construction provides the Whiteville, North Carolina area with impeccable work and customer service. We are highly experienced in our field and understand how... more

TL

House and Garage Demolition Tips for Ash, NC

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.