Demolish a Home in Buffalo, OH

Find the right contractor to demolish and remove anything

America's #1 Source for Local Demolition Experts

24774, 21056, 17444
Compare Demolition Quotes
BT

Burkhart Trucking & Excavating

Lowell, OH

Burkhart Trucking and Excavating provides top-tier house demolition service to the Mid-Ohio Valley. Regardless of the project, we execute each service with precision, efficiency, and a dedication to your schedule. more

Larry Lang Excavating logo

Larry Lang Excavating

Beverly, OH
  • Barns
  • Concrete & Asphalt
  • Mobile Homes
  • Since 1997
  • Top-tier equipment
  • Superior customer service

Larry Lang Excavating proudly serves the greater Beverly, OH area with exceptional demolition services. By utilizing top-tier equipment, we can successfully demolish and remove residential and commercial structures of all sizes. more

RJ

Russ James Contracting

Zanesville, OH

Licensed, bonded, and insured, we have more than 36 years of experience at Russ James Contracting. We can complete demolition projects of all shapes and sizes, including concrete removal, house demolition, and more. more

House and Garage Demolition Tips for Buffalo, OH

Project Tips for House & Garage Demolition

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.