34745, 35780, 34728, 34727, 34113, 30714, 33441, 19715, 24899, 22135, 15485, 15959, 25013, 22181, 27656

All "House Demolition" results near me in Holbrook, PA - June 2026

Grey Beard Junk Removal

Bridgeport, WV

Garage removal can be a messy and back-breaking job. Trust the experts to handle the dirty work for you efficiently and safely. Grey Beard Junk... more

GB

Junk Removal and Demo

Monongahela, PA
5.0
(1)
  • Chimney Removal
  • Interior Demolition
  • Light Demolition
  • Family owned
  • Experienced and knowledgeable
  • Upfront quotes

For garage and house demolition that is safe, fast, and affordable, Junk Removal and Demo is the crew to call. You can count on us... more

Junk Removal and Demo logo

Cochran & Son Construction

Clarksburg, WV

Based in Clarksburg, WV, Cochran & Son Construction is dedicated to providing quality construction and demolition services. Call us or request a quote today for your... more

CS

WV Contracting LLC

Bridgeport, WV

WV Contracting LLC combines experience and skill to offer a full spectrum of excavation and demolition services. Looking for house or garage demolition services? Contact... more

WC

Reclaim Company, LLC

Fairmont, WV

Reclaim Company's ability to provide all aspects of both structural and selective demolition services is what sets us apart in the industry. When we're involved,... more

RC

Inks Excavating, Inc.

Holbrook, PA
5.0
(1)
  • Pool Removal
  • Structural Demolition
  • Since 1996
  • Competitive prices

If you're in need of quality garage and house demolition services at rates that are competitive and affordable, Inks Excavating, Inc. has the solution you've... more

IE

Upgrade Demolition and Recycling

Donora, PA
5.0
(1)
  • Concrete Removal
  • Structural Demolition
  • Eco-friendly
  • Safety driven

We have been in the demolition business for over 12 years, working on projects with a wide variety of clients. We specialize in full house tear-downs... more

UD

Junk King Pittsburgh

Pittsburgh, PA
4.9
(30)
  • Deck and Fence Removal
  • Hot Tub Removal
  • Pool Removal
  • Best price guarantee
  • Fast & friendly service
  • Free upfront estimates

Junk King Pittsburgh is a locally-owned and operated junk removal and light demolition company. We specialize in fast, affordable full-service junk hauling and light demolition... more

JK

Cerminara Excavating & Construction Inc

Pittsburgh, PA

Here at Cerminara Excavating & Construction Inc., we care about customer satisfaction. We're proud to say that our owner still works with the clients,... more

Cerminara Excavating & Construction Inc logo

Massarelli Demolition & Excavating

Pittsburgh, PA

In Pittsburgh, Pennsylvania, Massarelli Demolition & Excavating is known for providing exceptional services to residential and commercial customers. We make the house demolition process as simple... more

MD

Thralls Contracting

Waynesburg, PA

From pool and concrete removals to barn and commercial demolition, Thralls Contracting is your trusted source for unparalleled results. We hold ourselves to the highest... more

TC

Brooks Etc

Smithfield, PA

Brooks Etc, based out of Smithfield, PA, is a full-service demolition company with the staff, equipment, and experience to handle projects large and small. From... more

BE

House and Garage Demolition Tips for Holbrook, PA

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.