17876, 21974, 16277, 28636

TGR Construction

Hornbeak, TN

TGR Construction is a veteran owned and operated company. We believe in building long lasting relationships with each of our clients, so it is our... more

TGR Construction logo

East Shelby Demolition and Pool Removal

Olive Branch, MS
5.0
(13)
  • Concrete Removal
  • Pool Removal
  • Small Structures
  • Free estimates

Based in Olive Branch and proudly serving the region since 2000, East Shelby Demolition & Pool Removal is your locally-owned source for residential demolition and pool... more

East Shelby Demolition and Pool Removal logo

Harris Trucking & Hauling

Dyersburg, TN

Proudly serving the Memphis, Tennessee area, Harris Trucking & Hauling provides customers with a wide range of services, including commercial demolition. Our mission is to provide... more

HT

Clifco Inc

Dyersburg, TN

Clifco Inc is a highly sought-after commercial demolition specialist serving all of Memphis, TN, and surrounding areas. We also offer residential demolition, including garage demolition,... more

CI

Commercial Demolition Tips for Halls, TN

Should I consider deconstructing a commercial building?

Commercial deconstruction is the process of taking apart the structure piece-by-piece; the goal being to salvage as much of the materials inside as possible.

This process is much more time-consuming than traditional mechanical demolition, but it can be quite rewarding.

Salvaged materials can be recycled, re-used, or sold, which could help offset the upfront cost.

How much does commercial demolition cost per square foot?

According to national averages, commercial demolition costs roughly $4-$8 per square foot. As square footage goes up, the cost per square foot can go down.

There are a number of things that can affect the cost of your project.

Common factors that influence the total cost of commercial demolition include:

  • Type of materials being demolished
  • Total square footage being demolished
  • Cost of living in your area
  • Accessibility of the work site
  • Demolition method used (by hand or with heavy machinery)
  • Complexity of the project
  • Presence of asbestos or other hazardous material
  • Who you hire

Learn more about deconstruction: