Sponsored results

18009, 21974, 20536, 22948

All "House Demolition" results near me in Fayette County, TN - April 2026

JUNK-it LLC

Holly Springs, MS
4.8
(4)
  • Concrete Removal
  • Decks & Fences
  • Shed Removal
  • Veteran owned
  • Flexible solutions
  • Offers free quotes

When a home or garage is beyond repair, demolition is often the best path forward. JUNK-it LLC provides full teardown services across the Holly Springs... more

JUNK-it LLC logo

East Shelby Demolition and Pool Removal

Olive Branch, MS
5.0
(13)
  • Concrete Removal
  • Pool Removal
  • Small Structures
  • Free estimates

We’re a locally owned and operated demolition provider offering cost-efficient house demolition services. East Shelby Demolition & Pool Removal is based in Olive Branch and... more

East Shelby Demolition and Pool Removal logo

Grinder Excavating

Cordova, TN

Grinder Excavating is a Memphis-based company that was founded in 1961. They develop imaginative and practical solutions to unusual problems. They have specialized equipment for a... more

GE

Dave Moore Companies, LLC

Memphis, TN

With more than 30 years of experience building, remodeling, and renovating homes, Dave Moore Companies, LLC has established itself as one of the most trusted... more

DM

House and Garage Demolition Tips for Fayette County, TN

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.