34372, 33475, 33474, 24844, 20872

Dumpster Dudez of South Texas

Pharr, TX
5.0
(1)
  • Concrete Removal
  • Interiors
  • Structures
  • Serving South Texas
  • Easy booking
  • Driveway friendly

Let Dumpster Dudez of South Texas tear down your unwanted house or garage. Our crew makes the demolition process as simple and stress-free as possible... more

Dumpster Dudez of South Texas logo

Jerry Resendez Enterprises

Laredo, TX

Jerry Resendez Enterprises is a Texas-based family-owned company with over three decades of experience in demolition and construction. We can handle all types of demolition,... more

JR

Royal E Construction, LLC

Laredo, TX

Royal E Construction, LLC. has been providing Laredo and South Texas with quality construction and demolition services with over 20 years of experience. Reach out to... more

RC

Modern Construction, Inc.

Laredo, TX

Since 1972, Modern Construction, Inc. has led the way in using our industry’s best practices. Our fleet of cutting-edge equipment is capable of performing a... more

MC

IIPG Enterprises, Inc.

Laredo, TX

IIPG Enterprises, Inc. is a locally owned and operated company serving the South Texas region. With more than 30 years of experience, we can perform residential... more

IE

House and Garage Demolition Tips for El Cenizo - Webb County, TX

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.