Sponsored results

30937, 15384, 19972, 23146, 15258, 15647, 32309, 19442, 17144, 30801, 18902, 19532, 19416, 32779, 21439, 20060, 16078, 22080, 36005, 22871, 16117, 30427, 22574, 23790, 15166, 20636, 24649, 16213, 32532, 23340

All "House Demolition" results near me in Venersborg, WA - November 2025

Track Works

Woodland, WA
5.0
(1)
  • Concrete Removal
  • Oil Tank Removal
  • Structural Demolition
  • Detail oriented
  • Hassle-free pricing
  • Professional and reliable

With over 5 years of experience in the land clearing and demolition industry, Track Works knows how to quickly, efficiently, and affordably remove and haul away... more

Track Works logo

Right Way Excavation

Battle Ground, WA

Right Way Excavation has the equipment and experience needed to help make your property the exact way you imagine. We can demolish houses, build rock... more

RW

Proexc Llc

Battle Ground, WA

Proexc, LLC is experienced in house demolition services, including excavation, site work, underground utilities, and site development. Serving all of Washington and Oregon, we are... more

PL

Prodan Construction LLC

Gresham, OR
4.5
(2)
  • Houses
  • Mobile Homes
  • Swimming Pools
  • Cost-effective solutions
  • Since 2007
  • Safety driven

Prodan Construction is a local general contractor with more than 25 years of experience. We focus on customer service and attention to detail, and we specialize... more

Prodan Construction LLC logo

Moore Excavation Inc

Fairview, OR

Moore Excavation is a full service construction group that serves general contractors, municipalities, and private developers throughout the Pacific Northwest. We are licensed in several... more

ME

McNealy Excavating

Washougal, WA

McNealy Excavating Inc. is a family owned company serving Skamania County. Established in 2003, our company has grown substantially over the years. We are a full... more

ME

Mayer Construction Inc

Lake Oswego, OR
5.0
(1)

Mayer Construction Inc is a seasoned demolition company based out of Lake Oswego, OR. We have a full-size excavator that allows us to take down... more

MC

Lovett Deconstruction

Portland, OR

Licensed, bonded, and insured, Lovett Deconstruction is proud to offer deconstruction—a sustainable alternative to mechanical demolition. They can quickly, efficiently, and safely deconstruct all... more

LD

LOI Environmental & Demolition Services

Lake Oswego, OR

LOI Demolition is a local asbestos abatement and demolition contractor. They have been serving Portland, OR for over 35 years. They have more than 100 years of... more

LOI Environmental & Demolition Services logo

Let It Go Solutions LLC

Portland, OR

Let It Go Solutions LLC offers a level of professionalism and commitment to the customer that few can match. We provide a single convenient source... more

LI

Larry O. Collins, Inc.

Vancouver, WA

For more than 75 years, Larry O. Collins Inc. has been a leader in excavation and demolition services in Southwest Washington. No matter the size or... more

LO

Larry Collins Company

Vancouver, WA

For more than 75 years, Larry O. Collins Inc. has been a leader in excavation and demolition services in Southwest Washington. No matter the size or... more

LC

House and Garage Demolition Tips for Venersborg, WA

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.