19687, 30427, 15713, 19026, 32309, 32133, 21468

Bozarth Underground Utilities & Excavation, Llc

Chehalis, WA

Bozarth Underground Utilities & Excavation, LLC works tirelessly to ensure that each and every customer we work with is left satisfied with their pool removal project... more

BU

EZ Haulers

Onalaska, WA
5.0
(2)
  • Concrete & Asphalt Removal
  • Small Structures
  • Fast services
  • Same-day service

When you need pool removal services you can count on, EZ Haulers is the crew to call. With 20 years of experience under our belt, our... more

EZ Haulers logo

Langseth Environmental LLC

Lakewood, WA

Langseth Environmental LLC can tackle demolition services of all sizes, including oil tank removal, interior demo, garage and shed demolition, pool removal, concrete removal, and... more

LE

Mark Higgins Trucking

Castle Rock, WA

Located in Castle Rock, Washington, Mark Higgins Trucking offers exceptional demolition, trucking, and excavating services. Our crew has the experience and equipment required to remove... more

MH

Mayer Construction Inc

Lake Oswego, OR
5.0
(1)

Mayer Construction Inc is a seasoned demolition company based out of Lake Oswego, OR. We have a full-size excavator that allows us to tear out... more

MC

PM Trucking

Spanaway, WA

PM Trucking specializes in demolition, hauling, junk removal, and dumpster rental services. Our team is always trustworthy and upfront about the work we provide, communicating... more

PT

Roy Thorp Construction & Excavation

Aberdeen, WA

Thorp Construction, based out of Aberdeen, WA, provides a plethora of services for residential and commercial customers. Our team works tirelessly to provide quality results... more

RT

Pool Removal Tips for Onalaska, WA

A pool fill-in—or partial pool removal—does not involve removing the entire pool, thus saving you time and money. Many homeowners choose this option as it is cheaper, faster, and does not take as long as a full removal. Pool fill-ins work as follows:

  • Drain the pool.
  • Punch holes into the bottom of the pool.
  • Demolish the top layer of the pool (18 in.-36 in.).
  • Place the rubble in the bottom of the pool.
  • Fill in the pool with additional dirt and topsoil.
  • Compact the soil.

Unless your city requires, a partial pool removal can be done without the oversight of an engineering technician. Be sure to confirm this with your contractor and/or local code enforcement entity.